An incredible project, with tight deadlines. January of 2023 Spark Ops was contracted to produce over 1 million dollars worth of product in only 4 weeks for Filmwerks on-site production for F1 Miami. With staggered logistic dates and delays not being an option, it was a full-team effort to complete this project. The end result was fantastic!

Details about Filmwerk's project all using DSS truss produced by Spark Ops:
  • 40,000 sq. ft. of truss structure and deck
  • 2 Weeks of load in/build time on-site
  • 28 Trucks of gear
  • 12,000+ Bolts used

And after the event, Filmwerks tore down all this temporary structure in only 5 days!

Hat's off to the Filmwerks and DSS team for an amazing product and allowing Spark Ops to be a part of these really cool projects.